ALDI Narellan

CommercialInfrastructure
Site

4 Queen Street, Narellan NSW 2567

Specifier

Henry & Hymas

Contractor

Haines Bros Earthmoving

Description

When designing a Stormwater treatment system for the new ALDI store at Narellan, the Engineers at Henry & Hymas utilised the Enviropod-Stormfilter treatment train. With a large carpark catchment, Enviropods were specified in surface inlet pits to remove any Gross pollutants present. StormFilters were housed in a precast manhole unit (supplied by Stormwater360) downstream of the EnviroPod pre-treatment, the StormFilters are ideal for reducing nutrient runoff from the site specifically reducing the amount of Total Nitrogen and Total Phosphorous as demonstrated in site specific Music modelling.

Maintenance

The StormFilter system is designed to achieve an annual maintenance frequency with EnviroPods to be serviced every 4 months.