Watermark Apartments, Bella Vista

ResidentialInfrastructure
Site

8 Solent Circuit, Baulkham Hills NSW 2153

Specifier

Sparks and Partners

Contractor

Foran Industries

Description

The site discharges to Strangers Creek, which is managed by Sydney Water.
Therefore the water quality objectives for the site 90% Gross Pollutants, 85% Total Suspended Solids, 65% Total Nitrogen, 45% Total Phosphorus were set by Sydney Water.
Products specified by the engineer included a Hydrodynamic separator and StormFilter cartridge filtration system.

Maintenance

The StormFilter system is designed to achieve an annual maintenance frequency. Periodic inspections and cleans are also scheduled to take place after major storm events or oil spills onsite.