Bingo Bins, Auburn

InfrastructureIndustrial
Site

3-5 Duck St, Auburn NSW 2144

Specifier

Building Services Engineers

Contractor

D & W Plumbing

Description

Council requirement was to provide treatment for sediment and oils prior to discharge into Duck Creek. The Vortsentry was only treating a small portion of the site. The Vortechs collected the majority of the site drainage and was preferred due to its shallow profile.

Maintenance

Inspection is the key to effective maintenance and is easily performed. Periodic inspections will take place and cleans after major storm events or oils spills onsite. EnviroPods to be serviced every