Bingo Recycling Upgrade, Greenacre

CommercialInfrastructure
Site

35 Wentworth St, Greenacre

Specifier

Stellen Consulting

Contractor

D&W Plumbing

Description

This project was located within Strathfield Council LGA, as part meeting the DCP for this Stellen Consulting opted to incorporate a Jellyfish filter with VortCapture pre-treatment. The pre-cast concrete units were manufactured in consultation with D&W Plumbing to ensure the units met site-specific drainage levels. Both systems were delivered simultaneously to site with the process of unloading and placing both tanks into a pre-excavated location taking under 2 hours.

Maintenance

As with most GPTs the typical maintenance frequency for the VortCapture system is every 12 months, however, given the nature of the pollutant loads on this site periodic inspections are being advised to monitor and develop an ongoing maintenance schedule. Similarly, we have recommended that the Jellyfish filter have periodic tentacle rinse and sump vacuuming every 6-12months with a cartridge life cycle ranging from 3-5 years.