Description

This was a retrofit project as part of an upgrade and update to an existing Caltex Service Station. Clear Sky Engineering opted for a small StormFilter system with EnviroPod pre-treatment. The fact that this was an existing site meant that a pre-cast concrete solution was ideal to ensure the quickest turnaround on site. Ultimately the unit was manufactured within 15 business days of it being ordered and was unloaded and placed in ground by the team at Davison Enterprises within 30 minutes of the system arriving on site.

Maintenance

The StormFilter system is designed to achieve annual maintenance cycles. EnviroPods to be serviced every 3-6 months. Periodic inspections will take place and cleans after major storm events.