Geelong Football Stadium, Victoria 3220
PB World
Auswater Solutions
The client was looking for a low cost storage solution for a stormwater harvesting project and needed to minimise the risk on a 6m deep installation below a car park. Stormwater360 provided their expertise in storage systems and provided a solution within acceptable safety factors. The final design was developed with input from the Client, Contractor and Stormwater360.
The Vortech model VX11000 GPT has a storage volume of 4.3m3 and has an estimated maintenance frequency of 4-6 months.