Goodman Development – Schenker Facility, Redbank

InfrastructureIndustrial
Site

Smith St - Morshead St, Redbank, QLD, 4301

Specifier

Northrop Engineers

Contractor

Builder - Hansen Yuncken

Description

The approximate site area of the industrial development is 85,000 sqm which is being treated by 8 x separate offline StormFilter precast systems. The site is predominantly made up of warehousing and car park areas hence Enviropods have been used as the primary form of pre-treatment to capture key pollutants such as Suspended Solids. The treatment devices satisfy Ipswich City Council Water Quality Objectives of 80% TSS Reduction, 60% TP Reduction, 45% TN Reduction and 90% Gross Pollutant Reduction. The treatment train is designed to provide optimal performance throughout the entire lifecycle with the contribution of periodic maintenance.

Maintenance

The StormFilter system is designed to achieve an annual maintenance frequency with EnviroPods to be serviced every 3-6 months. Periodic inspections and cleans are also scheduled to take place after ma