Kmart Eastern Creek

IndustrialInfrastructure
Site

Business Park, Eastern Creek, NSW 2766

Specifier

CostinRoe Consulting. Developer - Australand

Contractor

AWJ

Description

Australand and CostinRoe were seeking a solution to minimise the amount of bio retention required on site as the costs of the retaining walls along with the land take where very expensive. The SFEP Treatment Train is approved in the Blacktown area, thus was the perfect solution for this site.

Maintenance

The maintenance frequency for the Enviropods is 3-4 months and the StormFilter is approximately 18 months. Stormwater will inspect the cartridges in approximately 6 months.