27-49 Lenore Lane, Erskine Park, NSW 2759
Garey Sparks & Partners
Alliance Plumbing Pty Ltd
SFEP was adopted by the consulting engineer for a few reasons including:
- Bio Basin area was limited,
- Supplemental treatment was required to achieve target reductions for the site (80/45/45) as per Penrith Council DPC-C3 Water Management Policy, 2010,
- According to consultant, Council Engineers would not accept a GPT as a suitable measure to achieve nutrient reduction.
Each 23 Cartridge StormFilter system is designed to achieve annual maintenance cycles. The EnviroPods expected to be maintained once every 3-6 months.