Linfox, Erskine Park

InfrastructureIndustrial
Site

27-49 Lenore Lane, Erskine Park, NSW 2759

Specifier

Garey Sparks & Partners

Contractor

Alliance Plumbing Pty Ltd

Description

SFEP was adopted by the consulting engineer for a few reasons including:
- Bio Basin area was limited,
- Supplemental treatment was required to achieve target reductions for the site (80/45/45) as per Penrith Council DPC-C3 Water Management Policy, 2010,
- According to consultant, Council Engineers would not accept a GPT as a suitable measure to achieve nutrient reduction.

Maintenance

Each 23 Cartridge StormFilter system is designed to achieve annual maintenance cycles. The EnviroPods expected to be maintained once every 3-6 months.