Site

Cnr Wondall Rd & Radford Rd Manly West Qld 4179

Specifier

Hilton Reid & Partners

Contractor

TPM Builders

Description

It is proposed to connect all large roof areas of the proposed re-use tanks. The water shall be used for irrigation and toilet flushing as a minimum. These tanks will then surcharge into proposed Stormwater infrastructure and be treated by the StormFilter prior to discharge from site. All pavements shall be collected by a series of field inlets fitted with EnviroPods as pre-treatment prior to being treated by the StormFilter and discharging to the underground infrastructure.

Maintenance

Each 14 Cartridge StormFilter system is designed to achieve annual maintenance cycles. The EnviroPods expected to be maintained once every 3-6 months.