Description

The SFEP system was selected to treat stormwater flows from the first stage of this master planned 5.75 hectare site before discharge into council infrastructure and eventually to receiving waterways. The selected system is required to meet Brisbane City Council Water Quality Objectives of 80% TSS Reduction, 60% TP Reduction, 45% TN Reduction and 90% Gross Pollutant Reduction. In future stages, The Anthony John Group also plans to develop some 750 apartments and 17,000 sqm of retail and commercial premises, set amongst open communal spaces, green space and parkland on The East Village site. The underground stormwater treatment system is to be located within the open space area to maximize the useable site area of the development whilst still meeting/exceeding the Water Quality Objectives.

Maintenance

The 70 Cartridge StormFilter system is designed to achieve annual maintenance cycles. Enviropods to be serviced every 3-6 months. Periodic inspections will take place after major storm events.