Sugarmill Road, Pinkenba

InfrastructureIndustrial
Site

59 Sugarmill Road, Pinkenba QLD 4008

Specifier

Westera Partners Pty Ltd

Contractor

FDC Construction

Description

This project was designed by Westera Partners and is in the Brisbane LGA. Water quality targets are 80/60/45 and MUSIC modelling was required. The site is predominantly made up of warehousing with some hardstand areas hence Enviropods have been used as the primary form of pre-treatment to capture key pollutants such as Suspended Solids. Both Bio-retention and an offline StormFilter system is being implemented into the design with Bio treating the Northern (smaller) portion of the site. The treatment train is designed to provide optimal performance throughout the entire lifecycle with the contribution of periodic maintenance.

Maintenance

The 80 Cartridge StormFilter system is designed to achieve an annual maintenance frequency with EnviroPods to be serviced every 3-6 months. Periodic inspections and cleans are also scheduled to take p