Sydney Olympic Park

CommercialInfrastructure
Site

11 MURRY ROSE AV, SYDNEY OLYMPIC PARK NSW 2127

Specifier

Northrop

Contractor

Danny Hall

Description

This commercial development is part of the new Sydney Olympic Park Town Centre. The project was designed in conjunction with Northrop Engineers and had to meet Sydney Olympic Park Authority water quality targets. The Vortsentry HS-12 unit was chosen to treat the carpark and roof areas of the site for its ability to enhance gravitational separation of floating (hydrocarbons and floatables) and settling pollutants (sediment). The added benefit of a small footprint and an internal high flow bypass, to eliminate washout, makes the VortSentry HS an ideal treatment option when space is at a premium.

Maintenance

The VortSentry HS12 system is designed to achieve an annual maintenance frequency.